Project Experience

Jet grouting sealing gaps at power tower foundation trench

Kaohsiung Power Substation

Kaohsiung Power Substation

Gap sealing grouting at steel rail sheet piles around power tower foundation trenches, using low-pressure grouting to fill soil voids, block groundwater seepage, and improve ground stability.

Ground improvement near port with tidal conditions

Keelung Ocean Plaza

Keelung Ocean Plaza

5m diameter, 14m depth ground improvement.

Near port conditions required adapting methods to tides and aging pipelines, completed successfully.

Grouting flow meter for quality monitoring

Grouting Flow Meter System

Grouting Flow Meter System

Dual-use grouting flow meter for high and low pressure, monitoring flow during construction to ensure compliance with design and inspection standards.

Shaft ground improvement for shield machine entry

Kaohsiung Shaft Ground Improvement

Kaohsiung Shaft Ground Improvement

6m diameter, 21m depth ground improvement for shaft base and surroundings, supporting 2.4m shield entry and exit with bidirectional treatment.

Backfill grouting under railway tracks

Taitung Railway Backfill Grouting

Taitung Railway Backfill Grouting

Backfill grouting beneath railway tracks, executed during limited night shutdown periods to ensure safety and maintain railway operation.

Jet grouting for metro underground construction

Luzhou MRT Ground Improvement

Luzhou MRT Ground Improvement

JSG double pipe jet grouting used for ground improvement and seepage control in metro underground works, enhancing stability and safety.

Ground improvement for pipe roof works

Taichung Pipe Roof Improvement

Taichung Pipe Roof Improvement

Ground improvement around pipe roof area to strengthen soil structure and reduce groundwater impact for smooth construction.

Grouting for sewer shield zones

Sewer Grouting Works

Sewer Grouting Works

Grouting for shield launch, arrival, and connection zones, filling soil voids to improve stability and ensure underground construction safety.

Emergency grouting for seepage control

New Taipei Emergency Grouting

New Taipei Emergency Grouting

Emergency grouting for seepage and loose ground, restoring stability quickly and reducing construction risks.

Linnei Water Plant Improvement

Linnei Water Plant Improvement

Chemical grouting for waterworks shield project, improving soil conditions and enhancing bearing capacity and foundation stability.

Foundation leveling by grouting

Foundation Leveling Works

Foundation Leveling Works

Settlement correction by grouting after 17cm subsidence, restoring level condition and improving foundation stability.

Slab lifting grouting for power tower

Power Tower Slab Lifting

Power Tower Slab Lifting

Grouting correction for subsided slab, filling voids to restore stability and ensure facility safety.

Platform reinforcement by grouting

Neili Station Platform Reinforcement

Neili Station Platform Reinforcement

Platform foundation reinforcement by grouting to improve bearing capacity and ensure structural safety.

Full Ground Improvement Shaft

Full Ground Improvement Shaft

Full ground improvement around shaft to enhance strength and reduce groundwater effects for safe construction.

ALON chemical grouting for sealing

Su'ao Water ALON Grouting

Su'ao Water ALON Grouting

Chemical grouting using ALON material to penetrate soil voids, achieving reinforcement and water sealing.

Elevator pit grouting and reinforcement

Elevator Pit Grouting & Reinforcement

Elevator Pit Grouting & Reinforcement

Grouting and reinforcement at elevator pit to block groundwater and improve foundation stability.

Water sealing grouting works

Waterproof Grouting Works

Waterproof Grouting Works

Grouting to seal seepage, filling voids and blocking water paths to improve soil conditions and structural safety.