Project Examples
MRT project
JSG double pipe high pressure jet pile (replacement construction method)
Pipe curtain project
LW low pressure grouting method (backfill grouting)
Sewerage Engineering
LW low pressure grouting method
New Taipei City Government Xizhi District Emergency Repair Project
Emergency repair of road subsidence
Rinnai Waterworks
LW low pressure grouting method (backfill grouting)
Righting Project
The right side of the family cemetery sank 17 centimeters due to heavy rain for days. After straightening and grouting, it has reached a level with no deviation.
Fully renovated - Namiita shaft
JSG double pipe high pressure jet pile (replacement construction method)
Chemical grouting for water supply projects in Su'ao area (ALON)
JSG double-tube high-pressure jet pile with chemical grouting method (ALON: aluminum oxynitride powder)
Waterstop Grouting
Rubber water-stop grouting project after the splash shield machine leaves the pit (LW low-pressure grouting method) (groundwater level balance grouting method, commonly known as: pressurized water grouting)
Create maximum value
We insist on using the most advanced technology and high-quality materials, and follow the strictest quality standards to ensure the successful completion of each project. Through our efforts and expertise, we can bring the greatest value to our customers and make positive contributions to the construction of society. Let us work together and create a better future together.